Sakura COOLING ONLY Manual do Utilizador Página 12

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 23
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 11
7.2 Rigging Instruction
Caution
Guard bars are slightly
longe
r than size of the unit
Soft Material
Protection Block
Hoisting Hole
Position
Strict inspection and test have been made to every unit before it is delivered out of
factories to ensure the performance and quality. Therefore, please be careful d u r i n g
assembly and mobilization. Don’t damage control system and pipe components.
Mobilize the unit to the nearest assembly location before removing the package. Keep the
unit upward, carry the removed unit and assemble according to the following approach:
Move the unit with roller rod: Put three roller rods with the same size at the bottom
unit. Each of the rods shall be 1/5 longer than the width of the unit.
of the
Keep balance.
a.
b.
Lifting (reference to the following Graph).
12
GREE Central Air Conditioners
7.3 Mounting Location
R3
R4
R2R1
D
B
C
A
Vista de página 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 22 23

Comentários a estes Manuais

Sem comentários